Sequoia 1 (68200_SEQ1)

Sequoia 1 is a 401.4 MW solar interconnection project in Eastland, Texas with a current status of operational.

401.4 MWCapacity
OperationalStatus
ERCOMarket
SolarTechnology

Project facts

Canonical nameSequoia 1
Queue ID68200_SEQ1
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologySolar
Capacity401.4 MW
StateTexas
CountyEastland
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2025-12-01
Withdrawn date—
Developer—
Utility / transmission ownerSequoia 1 Solar Project

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata