Seven Creek Energy - Squab Hollow (0933)

Seven Creek Energy - Squab Hollow is a 290.0 MW battery interconnection project in Elk, Pennsylvania with a current status of withdrawn. It is proposed to connect at Homer City - Pierce Brook 345kV.

290.0 MWCapacity
WithdrawnStatus
AMarket
BatteryTechnology

Project facts

Canonical nameSeven Creek Energy - Squab Hollow
Queue ID0933
Statuswithdrawn
Source status0
MarketA
TechnologyBattery
Capacity290.0 MW
StatePennsylvania
CountyElk
Point of interconnectionHomer City - Pierce Brook 345kV
Requested (queue) date2019-10-31
Proposed in-service date2021-04-30
Operational date
Withdrawn date
DeveloperSeven Creek Energy, LLC
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata