Seville 2 (59723_SEV2)

Seville 2 is a 30.0 MW solar interconnection project in Imperial, California with a current status of operational.

30.0 MWCapacity
OperationalStatus
IIDMarket
SolarTechnology

Project facts

Canonical nameSeville 2
Queue ID59723_SEV2
Statusoperational
Source status(OP) Operating
MarketIID
TechnologySolar
Capacity30.0 MW
StateCalifornia
CountyImperial
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2015-12-01
Withdrawn date—
Developer—
Utility / transmission ownerDeriva Energy

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata