Sewaren 230kV (W2-023)

Sewaren 230kV is a 625.0 MW gas interconnection project in Middlesex, New Jersey with a current status of withdrawn.

625.0 MWCapacity
WithdrawnStatus
—Market
GasTechnology

Project facts

Canonical nameSewaren 230kV
Queue IDW2-023
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyGas
Capacity625.0 MW
StateNew Jersey
CountyMiddlesex
Point of interconnection—
Requested (queue) date2010-05-28
Proposed in-service date2017-05-31
Operational date—
Withdrawn date2015-02-24
Developer—
Utility / transmission ownerPSEG Long Island

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata