Sf150SB (LG-24-3-13)

Sf150SB is a 150.0 MW solar+battery interconnection project in El Paso County, Texas with a current status of active. It is proposed to connect at Wicked 115 kV Substation.

150.0 MWCapacity
ActiveStatus
TXMarket
Solar+BatteryTechnology

Project facts

Canonical nameSf150SB
Queue IDLG-24-3-13
Statusactive
Source statusLGIA EXECUTED
MarketTX
TechnologySolar+Battery
Capacity150.0 MW
StateTexas
CountyEl Paso County
Point of interconnectionWicked 115 kV Substation
Requested (queue) date2024-03-28
Proposed in-service date2027-05-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerEl Paso Electric Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: epe-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.