Sf250SB (LG-23-9-4)

Sf250SB is a 250.0 MW solar+battery interconnection project in Hudspeth County, Texas with a current status of active. It is proposed to connect at San Felipe 115kV Substation.

250.0 MWCapacity
ActiveStatus
TXMarket
Solar+BatteryTechnology

Project facts

Canonical nameSf250SB
Queue IDLG-23-9-4
Statusactive
Source statusLGIA EXECUTED
MarketTX
TechnologySolar+Battery
Capacity250.0 MW
StateTexas
CountyHudspeth County
Point of interconnectionSan Felipe 115kV Substation
Requested (queue) date2023-09-29
Proposed in-service date2028-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerEl Paso Electric Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: epe-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata