SGT Hoskins Solar Project Hybrid (67341_NOSES)

SGT Hoskins Solar Project Hybrid is a 102.1 MW battery interconnection project in Lamar, Texas with a current status of active.

102.1 MWCapacity
ActiveStatus
ERCOMarket
BatteryTechnology

Project facts

Canonical nameSGT Hoskins Solar Project Hybrid
Queue ID67341_NOSES
Statusactive
Source status(P) Planned for installation, but regulatory approvals not initiated
MarketERCO
TechnologyBattery
Capacity102.1 MW
StateTexas
CountyLamar
Point of interconnection
Requested (queue) date
Proposed in-service date2027-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerSGT Hoskins Solar Project, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata