Shade Gap-Three Springs KTS 23 kV (AF2-148)

Shade Gap-Three Springs KTS 23 kV is a 13.5 MW solar interconnection project in Huntingdon, Pennsylvania with a current status of withdrawn.

13.5 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameShade Gap-Three Springs KTS 23 kV
Queue IDAF2-148
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity13.5 MW
StatePennsylvania
CountyHuntingdon
Point of interconnection
Requested (queue) date2020-03-12
Proposed in-service date2023-09-01
Operational date
Withdrawn date2021-04-16
Developer
Utility / transmission ownerPENELEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.