Shady Oaks (Bus# 500780) to Coughlin (Bus# 500230) (J2082)

Shady Oaks (Bus# 500780) to Coughlin (Bus# 500230) is a 50.0 MW solar interconnection project in Rapides, Louisiana with a current status of withdrawn. It is proposed to connect at Shady Oaks (Bus# 500780) to Coughlin (Bus# 500230).

50.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameShady Oaks (Bus# 500780) to Coughlin (Bus# 500230)
Queue IDJ2082
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity50.0 MW
StateLouisiana
CountyRapides
Point of interconnectionShady Oaks (Bus# 500780) to Coughlin (Bus# 500230)
Requested (queue) date2021-09-02
Proposed in-service date2024-10-04
Operational date2024-10-04
Withdrawn date2025-03-07
Developer
Utility / transmission ownerCleco Power LLC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata