Shady Oaks (AD2-134)

Shady Oaks is a 105.9 MW wind interconnection project in Lee, Illinois with a current status of operational.

105.9 MWCapacity
OperationalStatus
Market
WindTechnology

Project facts

Canonical nameShady Oaks
Queue IDAD2-134
Statusoperational
Source statusPartially in Service - Under Construction
Market
TechnologyWind
Capacity105.9 MW
StateIllinois
CountyLee
Point of interconnection
Requested (queue) date2018-03-25
Proposed in-service date
Operational date2027-12-07
Withdrawn date
Developer
Utility / transmission ownerComEd

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata