Shannon - Minntac 230kV (J3405)

Shannon - Minntac 230kV is a 144.0 MW wind interconnection project in St. Louis, Minnesota with a current status of withdrawn. It is proposed to connect at Shannon - Minntac 230kV.

144.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameShannon - Minntac 230kV
Queue IDJ3405
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity144.0 MW
StateMinnesota
CountySt. Louis
Point of interconnectionShannon - Minntac 230kV
Requested (queue) date2024-04-10
Proposed in-service date2028-06-09
Operational date2028-06-09
Withdrawn date2025-09-26
Developer
Utility / transmission ownerMINNESOTA POWER INC.

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.