Shannon Wind Repower is a 18.5 MW other interconnection project in Archer, Texas with a current status of operational. It is proposed to connect at 1458 Cobb Switching Station 345 kV.

18.5 MWCapacity
OperationalStatus
ArcherMarket
OtherTechnology

Project facts

Canonical nameShannon Wind Repower
Queue ID25INR0583
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketArcher
TechnologyOther
Capacity18.5 MW
StateTexas
CountyArcher
Point of interconnection1458 Cobb Switching Station 345 kV
Requested (queue) date2024-02-27
Proposed in-service date
Operational date2027-09-15
Withdrawn date
DeveloperShannon-1 Wind Farm, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata