SHAWNEE BOTTOM SOLAR (26INR0281)

SHAWNEE BOTTOM SOLAR is a 153.0 MW solar interconnection project with a current status of withdrawn. It is proposed to connect at tap 138kV 3319 REDLAND_8 - 3120 NACOGDSE_8.

153.0 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameSHAWNEE BOTTOM SOLAR
Queue ID26INR0281
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity153.0 MW
State
County
Point of interconnectiontap 138kV 3319 REDLAND_8 - 3120 NACOGDSE_8
Requested (queue) date2023-09-22
Proposed in-service date2026-06-01
Operational date
Withdrawn date
DeveloperShawnee Bottom Solar, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.