Shelby-S.W. Lima 345kV (X3-030)

Shelby-S.W. Lima 345kV is a 245.0 MW wind interconnection project in Marion, Ohio with a current status of withdrawn.

245.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameShelby-S.W. Lima 345kV
Queue IDX3-030
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity245.0 MW
StateOhio
CountyMarion
Point of interconnection
Requested (queue) date2011-08-30
Proposed in-service date2015-12-31
Operational date
Withdrawn date2013-05-30
Developer
Utility / transmission ownerDayton

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata