SHELBY SS (J3092)

SHELBY SS is a 115.0 MW solar interconnection project in Bolivar, Mississippi with a current status of withdrawn. It is proposed to connect at SHELBY SS.

115.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameSHELBY SS
Queue IDJ3092
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity115.0 MW
StateMississippi
CountyBolivar
Point of interconnectionSHELBY SS
Requested (queue) date2022-09-14
Proposed in-service date2026-05-01
Operational date2026-05-01
Withdrawn date2025-07-30
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.