SHELBY SS (J3092)
SHELBY SS is a 115.0 MW solar interconnection project in Bolivar, Mississippi with a current status of withdrawn. It is proposed to connect at SHELBY SS.
115.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology
Project facts
| Canonical name | SHELBY SS |
|---|---|
| Queue ID | J3092 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Solar |
| Capacity | 115.0 MW |
| State | Mississippi |
| County | Bolivar |
| Point of interconnection | SHELBY SS |
| Requested (queue) date | 2022-09-14 |
| Proposed in-service date | 2026-05-01 |
| Operational date | 2026-05-01 |
| Withdrawn date | 2025-07-30 |
| Developer | — |
| Utility / transmission owner | ENTERGY ARKANSAS |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata