Shepard Energy Storage (25INR0262)

Shepard Energy Storage is a 256.8 MW other interconnection project in Galveston, Texas with a current status of operational. It is proposed to connect at # 38900 Hidden Lakes - # 42015 PHR 138 KV .

256.8 MWCapacity
OperationalStatus
GalvestonMarket
OtherTechnology

Project facts

Canonical nameShepard Energy Storage
Queue ID25INR0262
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketGalveston
TechnologyOther
Capacity256.8 MW
StateTexas
CountyGalveston
Point of interconnection# 38900 Hidden Lakes - # 42015 PHR 138 KV
Requested (queue) date2022-12-15
Proposed in-service date
Operational date2027-07-01
Withdrawn date
DeveloperShepard Energy Storage LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata