Sherburne Storage (C24-318)

Sherburne Storage is a 40.0 MW battery interconnection project in Chenango, New York with a current status of active. It is proposed to connect at County Line 46 kV Substation.

40.0 MWCapacity
ActiveStatus
EMarket
BatteryTechnology

Project facts

Canonical nameSherburne Storage
Queue IDC24-318
Statusactive
Source status6
MarketE
TechnologyBattery
Capacity40.0 MW
StateNew York
CountyChenango
Point of interconnectionCounty Line 46 kV Substation
Requested (queue) date2024-10-04
Proposed in-service date
Operational date
Withdrawn date
DeveloperNexamp Solar
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.