Sherco Solar II (68776_SHS02)

Sherco Solar II is a 237.1 MW solar interconnection project in Sherburne, Minnesota with a current status of operational.

237.1 MWCapacity
OperationalStatus
MISOMarket
SolarTechnology

Project facts

Canonical nameSherco Solar II
Queue ID68776_SHS02
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologySolar
Capacity237.1 MW
StateMinnesota
CountySherburne
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2025-09-01
Withdrawn date—
Developer—
Utility / transmission ownerNORTHERN STATES POWER COMPANY

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata