Sherco South BESS (E0041)

Sherco South BESS is a 313.9 MW battery interconnection project in Sherburne, Minnesota with a current status of active. It is proposed to connect at Sherburne Co 345kV Subtation.

313.9 MWCapacity
ActiveStatus
MISOMarket
BatteryTechnology

Project facts

Canonical nameSherco South BESS
Queue IDE0041
Statusactive
Source statusactive
MarketMISO
TechnologyBattery
Capacity313.9 MW
StateMinnesota
CountySherburne
Point of interconnectionSherburne Co 345kV Subtation
Requested (queue) date2025-08-06
Proposed in-service date2027-07-29
Operational date
Withdrawn date
DeveloperXcel Energy
Utility / transmission ownerXcel/SPS

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.