SHERMAN ENERGY STORAGE (1915)

SHERMAN ENERGY STORAGE is a 250.0 MW battery interconnection project in Contra Costa, California with a current status of active. It is proposed to connect at Contra Costa PP 230 kV.

250.0 MWCapacity
ActiveStatus
GBAMarket
BatteryTechnology

Project facts

Canonical nameSHERMAN ENERGY STORAGE
Queue ID1915
Statusactive
Source statusACTIVE
MarketGBA
TechnologyBattery
Capacity250.0 MW
StateCalifornia
CountyContra Costa
Point of interconnectionContra Costa PP 230 kV
Requested (queue) date2021-04-15
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectactivehigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata