Sherrill 115kV (J2231)

Sherrill 115kV is a 97.5 MW solar interconnection project in Jefferson, Arkansas with a current status of withdrawn. It is proposed to connect at Sherrill 115kV.

97.5 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameSherrill 115kV
Queue IDJ2231
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity97.5 MW
StateArkansas
CountyJefferson
Point of interconnectionSherrill 115kV
Requested (queue) date2021-08-12
Proposed in-service date2024-02-01
Operational date2024-02-01
Withdrawn date2025-03-07
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata