Shingletown-Lewistown 230 kV (AG2-590 - moved to TC2)

Shingletown-Lewistown 230 kV is a 38.2 MW solar interconnection project in Huntingdon, Pennsylvania with a current status of withdrawn.

38.2 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameShingletown-Lewistown 230 kV
Queue IDAG2-590 - moved to TC2
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity38.2 MW
StatePennsylvania
CountyHuntingdon
Point of interconnection—
Requested (queue) date2021-03-31
Proposed in-service date2024-06-01
Operational date—
Withdrawn date2025-01-30
Developer—
Utility / transmission ownerPENELEC

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata