Shiprock 345- Sub (2018-G6)

Shiprock 345- Sub is a 360.0 MW solar interconnection project in San Juan County, New Mexico with a current status of active. It is proposed to connect at Shiprock 345- Sub.

360.0 MWCapacity
ActiveStatus
NMMarket
SolarTechnology

Project facts

Canonical nameShiprock 345- Sub
Queue ID2018-G6
Statusactive
Source statusIA PENDING
MarketNM
TechnologySolar
Capacity360.0 MW
StateNew Mexico
CountySan Juan County
Point of interconnectionShiprock 345- Sub
Requested (queue) date2018-09-10
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; wapa-rm-oasis. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata