Shiprock 345- Sub (2018-G6)
Shiprock 345- Sub is a 360.0 MW solar interconnection project in San Juan County, New Mexico with a current status of active. It is proposed to connect at Shiprock 345- Sub.
360.0 MWCapacity
ActiveStatus
NMMarket
SolarTechnology
Project facts
| Canonical name | Shiprock 345- Sub |
|---|---|
| Queue ID | 2018-G6 |
| Status | active |
| Source status | IA PENDING |
| Market | NM |
| Technology | Solar |
| Capacity | 360.0 MW |
| State | New Mexico |
| County | San Juan County |
| Point of interconnection | Shiprock 345- Sub |
| Requested (queue) date | 2018-09-10 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | WAPA/BEPC/HCPD Integrated System |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; wapa-rm-oasis. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | active | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata