Shorewood 138kV (AI1-119)

Shorewood 138kV is a 28.8 MW solar interconnection project in Kendall, Illinois with a current status of withdrawn.

28.8 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameShorewood 138kV
Queue IDAI1-119
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity28.8 MW
StateIllinois
CountyKendall
Point of interconnection
Requested (queue) date2022-09-06
Proposed in-service date2026-06-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerComEd

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata