Short River BESS (30INR0112)

Short River BESS is a 150.4 MW other interconnection project in Comal, Texas with a current status of active. It is proposed to connect at 7456 LOP3378 138kV.

150.4 MWCapacity
ActiveStatus
ComalMarket
OtherTechnology

Project facts

Canonical nameShort River BESS
Queue ID30INR0112
Statusactive
Source statusSS Started, FIS Started, No IA
MarketComal
TechnologyOther
Capacity150.4 MW
StateTexas
CountyComal
Point of interconnection7456 LOP3378 138kV
Requested (queue) date2026-07-08
Proposed in-service date2030-04-30
Operational date—
Withdrawn date—
DeveloperHorizon Energy LLC
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-31new_project—activehigh

Explore related data

Source last checked2026-09-30
Data last materially changed2026-09-30
Page data generated2026-10-12

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.