Shutler Energy Storage (70225_SES)

Shutler Energy Storage is a 41.0 MW battery interconnection project in Gilliam, Oregon with a current status of active.

41.0 MWCapacity
ActiveStatus
AVRNMarket
BatteryTechnology

Project facts

Canonical nameShutler Energy Storage
Queue ID70225_SES
Statusactive
Source status(U) Under construction, less than or equal to 50 percent complete
MarketAVRN
TechnologyBattery
Capacity41.0 MW
StateOregon
CountyGilliam
Point of interconnection—
Requested (queue) date—
Proposed in-service date2028-03-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerAvangrid Power LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.