Sideoats Solar 2 (30INR0124)
Sideoats Solar 2 is a 167.6 MW solar interconnection project in Throckmorton, Texas with a current status of active. It is proposed to connect at DUSTYROAD_5 (11050) to GRHAMSES1 (1430) 345kV.
167.6 MWCapacity
ActiveStatus
ThrockmortonMarket
SolarTechnology
Project facts
| Canonical name | Sideoats Solar 2 |
|---|---|
| Queue ID | 30INR0124 |
| Status | active |
| Source status | SS Started, FIS Started, No IA |
| Market | Throckmorton |
| Technology | Solar |
| Capacity | 167.6 MW |
| State | Texas |
| County | Throckmorton |
| Point of interconnection | DUSTYROAD_5 (11050) to GRHAMSES1 (1430) 345kV |
| Requested (queue) date | 2026-09-18 |
| Proposed in-service date | 2031-03-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Bush Knob Solar, LLC |
| Utility / transmission owner | ERCOT |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-10-30 | new_project | — | active | high |
Explore related data
Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-26
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.