Siebrecht 115 kV Substation (ERAS-2025-035)

Siebrecht 115 kV Substation is a 138.0 MW gas interconnection project in Aberdeen, South Dakota with a current status of active. It is proposed to connect at Siebrecht 115 kV Substation.

138.0 MWCapacity
ActiveStatus
SDMarket
GasTechnology

Project facts

Canonical nameSiebrecht 115 kV Substation
Queue IDERAS-2025-035
Statusactive
Source statusIA FULLY EXECUTED/ON SCHEDULE
MarketSD
TechnologyGas
Capacity138.0 MW
StateSouth Dakota
CountyAberdeen
Point of interconnectionSiebrecht 115 kV Substation
Requested (queue) date2025-10-02
Proposed in-service date2030-08-15
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerNWPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-11operational_date2029-06-14—medium
2026-09-11proposed_online_date—2030-08-15medium
2026-09-11statusoperationalactivehigh
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata