Sienna 2 Solar and Storage Project (68486_44STA)

Sienna 2 Solar and Storage Project is a 55.0 MW solar interconnection project in San Bernardino, California with a current status of active.

55.0 MWCapacity
ActiveStatus
CISOMarket
SolarTechnology

Project facts

Canonical nameSienna 2 Solar and Storage Project
Queue ID68486_44STA
Statusactive
Source status(P) Planned for installation, but regulatory approvals not initiated
MarketCISO
TechnologySolar
Capacity55.0 MW
StateCalifornia
CountySan Bernardino
Point of interconnection
Requested (queue) date
Proposed in-service date2029-03-01
Operational date
Withdrawn date
Developer
Utility / transmission owner44ST 8ME LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata