Siete (20INR0047)

Siete is a 492.8 MW other interconnection project in Webb, Texas with a current status of operational. It is proposed to connect at 345kV 8718 Triada.

492.8 MWCapacity
OperationalStatus
WebbMarket
OtherTechnology

Project facts

Canonical nameSiete
Queue ID20INR0047
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketWebb
TechnologyOther
Capacity492.8 MW
StateTexas
CountyWebb
Point of interconnection345kV 8718 Triada
Requested (queue) date2018-10-23
Proposed in-service date
Operational date2029-03-31
Withdrawn date
DeveloperApex Clean
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata