Silver Dollar Storage (27INR0187)

Silver Dollar Storage is a 153.1 MW other interconnection project in Freestone, Texas with a current status of operational. It is proposed to connect at Tap 345 kV Big Brown 3380 to Navarro 68091 ckt#2.

153.1 MWCapacity
OperationalStatus
FreestoneMarket
OtherTechnology

Project facts

Canonical nameSilver Dollar Storage
Queue ID27INR0187
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketFreestone
TechnologyOther
Capacity153.1 MW
StateTexas
CountyFreestone
Point of interconnectionTap 345 kV Big Brown 3380 to Navarro 68091 ckt#2
Requested (queue) date2024-06-03
Proposed in-service date
Operational date2028-04-28
Withdrawn date
DeveloperSilver Dollar Solar Project, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata