Silver Lake 345 kV (AG2-544 - moved to TC2)

Silver Lake 345 kV is a 200.0 MW battery interconnection project in McHenry, Illinois with a current status of active.

200.0 MWCapacity
ActiveStatus
Market
BatteryTechnology

Project facts

Canonical nameSilver Lake 345 kV
Queue IDAG2-544 - moved to TC2
Statusactive
Source statusActive
Market
TechnologyBattery
Capacity200.0 MW
StateIllinois
CountyMcHenry
Point of interconnection
Requested (queue) date2021-03-31
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerComEd

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata