Silver Lake 345kV (X2-019)

Silver Lake 345kV is a 225.0 MW gas interconnection project in Lake, Illinois with a current status of withdrawn.

225.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameSilver Lake 345kV
Queue IDX2-019
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity225.0 MW
StateIllinois
CountyLake
Point of interconnection
Requested (queue) date2011-05-25
Proposed in-service date2015-05-31
Operational date
Withdrawn date2013-07-08
Developer
Utility / transmission ownerComEd

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata