SILVER LAKE- CHERRY VALLEY 345 KV (AF2-349 - moved to TC1)

SILVER LAKE- CHERRY VALLEY 345 KV is a 300.0 MW solar interconnection project in McHenry, Illinois with a current status of active.

300.0 MWCapacity
ActiveStatus
—Market
SolarTechnology

Project facts

Canonical nameSILVER LAKE- CHERRY VALLEY 345 KV
Queue IDAF2-349 - moved to TC1
Statusactive
Source statusEngineering and Procurement
Market—
TechnologySolar
Capacity300.0 MW
StateIllinois
CountyMcHenry
Point of interconnection—
Requested (queue) date2020-03-31
Proposed in-service date2029-09-30
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerComEd

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—activehigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata