Silverstrand Grid Energy Storage System (63735_SLV01)

Silverstrand Grid Energy Storage System is a 11.0 MW battery interconnection project in Ventura, California with a current status of operational.

11.0 MWCapacity
OperationalStatus
CISOMarket
BatteryTechnology

Project facts

Canonical nameSilverstrand Grid Energy Storage System
Queue ID63735_SLV01
Statusoperational
Source status(OA) Out of service but expected to return to service in next calendar year
MarketCISO
TechnologyBattery
Capacity11.0 MW
StateCalifornia
CountyVentura
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2021-04-01
Withdrawn date
Developer
Utility / transmission ownerSilverstrand Grid, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata