Simple Cycle Combustion Turbine Repowering (alternative to Q647) (879)

Simple Cycle Combustion Turbine Repowering (alternative to Q647) is a 376.0 MW gas interconnection project in Middlesex, Connecticut with a current status of withdrawn. It is proposed to connect at Middletown 115 kV substation, Bus A, between breakers 1T and 2T.

376.0 MWCapacity
WithdrawnStatus
CTMarket
GasTechnology

Project facts

Canonical nameSimple Cycle Combustion Turbine Repowering (alternative to Q647)
Queue ID879
Statuswithdrawn
Source statusW
MarketCT
TechnologyGas
Capacity376.0 MW
StateConnecticut
CountyMiddlesex
Point of interconnectionMiddletown 115 kV substation, Bus A, between breakers 1T and 2T
Requested (queue) date2019-04-15
Proposed in-service date2023-05-31
Operational date
Withdrawn date2019-05-28
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata