Simple Cycle Gas Turbine (617)

Simple Cycle Gas Turbine is a 61.9 MW gas interconnection project in Essex, Massachusetts with a current status of operational. It is proposed to connect at Peabody Waters River Substation.

61.9 MWCapacity
OperationalStatus
BOSTMarket
GasTechnology

Project facts

Canonical nameSimple Cycle Gas Turbine
Queue ID617
Statusoperational
Source statusC
MarketBOST
TechnologyGas
Capacity61.9 MW
StateMassachusetts
CountyEssex
Point of interconnectionPeabody Waters River Substation
Requested (queue) date2016-07-22
Proposed in-service date
Operational date2024-06-29
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata