Sisters Irrigation Hydro Project (G0466)

Sisters Irrigation Hydro Project is a 1.0 MW other interconnection project in Deschutes, Oregon with a current status of operational. It is proposed to connect at 68000 Hwy 20 W, Bend, OR 97701.

1.0 MWCapacity
OperationalStatus
ORMarket
OtherTechnology

Project facts

Canonical nameSisters Irrigation Hydro Project
Queue IDG0466
Statusoperational
Source statusENERGIZED
MarketOR
TechnologyOther
Capacity1.0 MW
StateOregon
CountyDeschutes
Point of interconnection68000 Hwy 20 W, Bend, OR 97701
Requested (queue) date2011-10-04
Proposed in-service date
Operational date2013-09-03
Withdrawn date
DeveloperThree Sisters Irrigation District
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.