Sisters Solar (21INR0265)

Sisters Solar is a 100.5 MW solar interconnection project in Ector, Texas with a current status of operational. It is proposed to connect at tapping the 345 kV line connecting Moss Switch (Bus# 1018) to Wolf Switching Station (Bus# 11010) .

100.5 MWCapacity
OperationalStatus
EctorMarket
SolarTechnology

Project facts

Canonical nameSisters Solar
Queue ID21INR0265
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketEctor
TechnologySolar
Capacity100.5 MW
StateTexas
CountyEctor
Point of interconnectiontapping the 345 kV line connecting Moss Switch (Bus# 1018) to Wolf Switching Station (Bus# 11010)
Requested (queue) date2019-02-28
Proposed in-service date
Operational date2028-02-21
Withdrawn date
DeveloperOberon Solar III, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata