Sisters Solar - Phase 2 (27INR0570)

Sisters Solar - Phase 2 is a 201.5 MW solar interconnection project in Ector, Texas with a current status of active. It is proposed to connect at 10009 McGee 345 kV.

201.5 MWCapacity
ActiveStatus
EctorMarket
SolarTechnology

Project facts

Canonical nameSisters Solar - Phase 2
Queue ID27INR0570
Statusactive
Source statusSS Started, FIS Started, No IA
MarketEctor
TechnologySolar
Capacity201.5 MW
StateTexas
CountyEctor
Point of interconnection10009 McGee 345 kV
Requested (queue) date2026-07-22
Proposed in-service date2028-09-23
Operational date—
Withdrawn date—
DeveloperOberon Solar III, LLC
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-30proposed_online_date2028-05-312028-09-23medium
2026-08-31new_project—activehigh

Explore related data

Source last checked2026-09-30
Data last materially changed2026-09-30
Page data generated2026-10-11

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata