Site C Brazos G (17INR0013)

Site C Brazos G is a 800.0 MW gas interconnection project with a current status of withdrawn. It is proposed to connect at tap one 345kV Venus - 68090 Sam Switch ckt.

800.0 MWCapacity
WithdrawnStatus
ERCOTMarket
GasTechnology

Project facts

Canonical nameSite C Brazos G
Queue ID17INR0013
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyGas
Capacity800.0 MW
State
County
Point of interconnectiontap one 345kV Venus - 68090 Sam Switch ckt
Requested (queue) date2014-04-25
Proposed in-service date2021-08-01
Operational date
Withdrawn date
DeveloperBrazos Elec Coop
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.