Six Flags Magic Mountain (67283_6569B)

Six Flags Magic Mountain is a 2.0 MW battery interconnection project in Los Angeles, California with a current status of active.

2.0 MWCapacity
ActiveStatus
CISOMarket
BatteryTechnology

Project facts

Canonical nameSix Flags Magic Mountain
Queue ID67283_6569B
Statusactive
Source status(V) Under construction, more than 50 percent complete
MarketCISO
TechnologyBattery
Capacity2.0 MW
StateCalifornia
CountyLos Angeles
Point of interconnection
Requested (queue) date
Proposed in-service date2026-09-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerMagic Mountain Parkway Solar Project 2023, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata