Sixmile Canyon 500kV Substation (L0521)

Sixmile Canyon 500kV Substation is a 1,050.0 MW other interconnection project in Umatilla, Oregon with a current status of withdrawn. It is proposed to connect at BPA's proposed Longhorn Substation.

1,050.0 MWCapacity
WithdrawnStatus
ORMarket
OtherTechnology

Project facts

Canonical nameSixmile Canyon 500kV Substation
Queue IDL0521
Statuswithdrawn
Source statusWITHDRAWN
MarketOR
TechnologyOther
Capacity1,050.0 MW
StateOregon
CountyUmatilla
Point of interconnectionBPA's proposed Longhorn Substation
Requested (queue) date2022-03-18
Proposed in-service date2026-01-02
Operational date
Withdrawn date
DeveloperPacifiCorp
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.