Skyrider Wind (29INR0025)

Skyrider Wind is a 370.0 MW other interconnection project in Pecos, Texas with a current status of operational. It is proposed to connect at 138kV #38365 TNPINION.

370.0 MWCapacity
OperationalStatus
PecosMarket
OtherTechnology

Project facts

Canonical nameSkyrider Wind
Queue ID29INR0025
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketPecos
TechnologyOther
Capacity370.0 MW
StateTexas
CountyPecos
Point of interconnection138kV #38365 TNPINION
Requested (queue) date2024-11-19
Proposed in-service date
Operational date2028-07-01
Withdrawn date
DeveloperNextera
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.