Slager Lake Wind (29INR0042)

Slager Lake Wind is a 310.2 MW other interconnection project in Reagan, Texas with a current status of operational. It is proposed to connect at Tap 345kV 59903 Bearkat – 76000 NORTMC5_1Y; Badger 345 kV Station.

310.2 MWCapacity
OperationalStatus
ReaganMarket
OtherTechnology

Project facts

Canonical nameSlager Lake Wind
Queue ID29INR0042
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketReagan
TechnologyOther
Capacity310.2 MW
StateTexas
CountyReagan
Point of interconnectionTap 345kV 59903 Bearkat – 76000 NORTMC5_1Y; Badger 345 kV Station
Requested (queue) date2025-09-09
Proposed in-service date
Operational date2029-07-01
Withdrawn date
DeveloperNextera
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata