Sleepy Hollow 138 kV (AG1-416)

Sleepy Hollow 138 kV is a 125.0 MW solar interconnection project in Jefferson, West Virginia with a current status of withdrawn.

125.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameSleepy Hollow 138 kV
Queue IDAG1-416
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity125.0 MW
StateWest Virginia
CountyJefferson
Point of interconnection—
Requested (queue) date2020-09-30
Proposed in-service date2028-08-31
Operational date—
Withdrawn date2025-06-26
Developer—
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata