Sloopy Storage (AH1-319)

Sloopy Storage is a 54.0 MW battery interconnection project in Clark, Ohio with a current status of withdrawn. It is proposed to connect at East Springfield-London 138 kV II.

54.0 MWCapacity
WithdrawnStatus
PJMMarket
BatteryTechnology

Project facts

Canonical nameSloopy Storage
Queue IDAH1-319
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologyBattery
Capacity54.0 MW
StateOhio
CountyClark
Point of interconnectionEast Springfield-London 138 kV II
Requested (queue) date2021-09-10
Proposed in-service date2025-12-31
Operational date
Withdrawn date2025-07-03
DeveloperInvenergy
Utility / transmission ownerATSI

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.