Smith Lake Solar DC (24INR0172)

Smith Lake Solar DC is a 402.0 MW solar interconnection project in Grimes, Texas with a current status of operational. It is proposed to connect at TAP 345 KV 44645 SINGLETON - 44900 ZENITH Ckt #99.

402.0 MWCapacity
OperationalStatus
GrimesMarket
SolarTechnology

Project facts

Canonical nameSmith Lake Solar DC
Queue ID24INR0172
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketGrimes
TechnologySolar
Capacity402.0 MW
StateTexas
CountyGrimes
Point of interconnectionTAP 345 KV 44645 SINGLETON - 44900 ZENITH Ckt #99
Requested (queue) date2022-02-07
Proposed in-service date
Operational date2028-12-29
Withdrawn date
DeveloperSmith Lake Solar
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata