Smith-N. Fayette 138kV (Z2-064)

Smith-N. Fayette 138kV is a 651.0 MW gas interconnection project in Washington, Pennsylvania with a current status of withdrawn.

651.0 MWCapacity
WithdrawnStatus
—Market
GasTechnology

Project facts

Canonical nameSmith-N. Fayette 138kV
Queue IDZ2-064
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyGas
Capacity651.0 MW
StatePennsylvania
CountyWashington
Point of interconnection—
Requested (queue) date2014-04-10
Proposed in-service date2018-06-01
Operational date—
Withdrawn date2015-06-25
Developer—
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.