Smokey Hollow Solar (C24-143)

Smokey Hollow Solar is a 70.0 MW solar+battery interconnection project in Wyoming, New York with a current status of withdrawn. It is proposed to connect at Line 907 Substation 162 and Houghton Substation (S180). 115kV.

70.0 MWCapacity
WithdrawnStatus
NYISOMarket
Solar+BatteryTechnology

Project facts

Canonical nameSmokey Hollow Solar
Queue IDC24-143
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologySolar+Battery
Capacity70.0 MW
StateNew York
CountyWyoming
Point of interconnectionLine 907 Substation 162 and Houghton Substation (S180). 115kV
Requested (queue) date2024-09-09
Proposed in-service date
Operational date
Withdrawn date
DeveloperSmokey Hollow Solar
Utility / transmission ownerRGE

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata